Iron Ore Case Study
Severe Belt Mistracking Issue Solved
One of our clients faced major production disruptions when an 1800mm-wide iron ore feed conveyor with a single loading point repeatedly shut down due to severe mistracking. After competitor tracker rollers failed to resolve the issue, we installed an RG2-1800 return roller, which resulted in major improvements. Check out the results and client feedback below.
The Results
66%
Fewer trips per week
3.84 ⟶ 1.29 Trips
78.8%
Less downtime per week
50.21 ⟶ 10.62 Minutes
64%
Fewer trips per million tonnes
4.25 ⟶ 1.53 Trips
77.3%
Less downtime per million tonnes
55.54 ⟶ 12.59 Minutes
Client Feedback
“After a simple analysis, we have seen a reduction of ~80% in downtime due to belt drift between before installation of the tracking frame and now (Before: 50mins/week downtime and After: 10mins/week downtime). We are keen to replicate this reduction on the other 2 similar set up conveyors”